Home Open Jobs Checklists Resources Training Labor Account
Training › Checklist Training › Module 05
Module 05

Manufacturing & Quality Check

Documenting fabrication in SquareCoil, recording the completion date, and verifying all items meet standards before they leave the shop.

2 Sections  ·  Mfg  ·  Low Complexity
SEC 01 Manufacturing

The Manufacturing section covers what needs to be documented in SquareCoil as the job is being built and when it wraps up. The goal is to make sure SquareCoil stays current so every department has accurate information throughout production. The specific scope of work being manufactured is listed in the Scope of Work section on the physical checklist.

  • 1
    Photograph the Work and Add Notes to SquareCoil
    Document the manufacturing process with in-progress photos and upload them to SquareCoil as the job is being built. Add any relevant notes — material choices, decisions made on the floor, anything the PM or install team would benefit from knowing. Do this as you go, not just at the end. SquareCoil Training · Module 04: Uploading Photos →
  • 2
    Enter All Material Information into SquareCoil
    Every material used on the job — quantities, specifications, suppliers — must be entered into SquareCoil before the job leaves the shop. This information is used for costing, closeout, and future reference. Incomplete material records create problems at invoicing. SquareCoil Training · Module 06: Inputting Materials →
  • 3
    Set the Manufacturing Completion Date in Project Status
    Once manufacturing is finished, update the manufacturing completion date in Project Status. This should reflect the actual date fabrication was completed — not when it was scheduled. This date signals to the PM and install team that the job is ready to move forward.
Manufacturer
Manager
SEC 02 Quality Check

The Quality Check must be completed before any fabricated items leave the shop. This is the last opportunity to catch errors before they become install problems. Manufacturing jobs have additional requirements beyond the standard Low Complexity quality check — those are called out below.

  • 1
    Confirm All Items Match the Design Sheet
    Compare every fabricated item against the design sheet. Check dimensions, materials, and finish. Anything that doesn't match the design sheet needs to be corrected before the job is cleared. Don't rely on memory — review the actual design sheet side by side.
  • 2
    Confirm All Items Meet Zeon's Quality Standards
    Do a thorough visual and structural check of every item. Look for clean welds, consistent paint or vinyl application, proper illumination (if applicable), and overall structural integrity. Items that wouldn't pass a customer's review should not leave the shop.
  • 3
    Verify All Items Match the Permit and Engineering Specs
    Manufacturing jobs must match the permit-approved plans and engineering specifications exactly — not just the design sheet. A sign that doesn't match the stamped plans will fail inspection.
    Manufacturing only. This step applies to Manufacturing jobs. Low Complexity jobs skip this step.
  • 4
    Confirm External Disconnect Switches are Installed on All Illuminated Signs
    All illuminated signs on Manufacturing jobs are required to have external disconnect switches installed. Verify each one is in place and take photos to document them.
    Manufacturing only. Take photos of the disconnect switches before the job leaves the shop.
  • 5
    Confirm UL Labels are Affixed and Verified on All Illuminated Signs
    All illuminated signs on Manufacturing jobs must have UL labels properly affixed and verified before leaving the shop. Take photos to document each label.
    Manufacturing only. Take photos of the UL labels before the job leaves the shop.
  • 6
    Upload Quality Check Photos to SquareCoil
    Upload all quality check photos to SquareCoil. This includes the general finished-product photos for Low Complexity jobs, and the additional disconnect switch and UL label photos for Manufacturing jobs. Quality check photos must be in SquareCoil before the job is cleared to ship. SquareCoil Training · Module 04: Uploading Photos →
Manufacturer
Manager
Next Module
Module 06 — Installation, Post-Install, Post-Service & Customer Signature
Start Module 06 →